How does design-led construction differ from traditional methods?
With traditional construction methods, much of the decision-making happens on-site, relying on the skill of the builder on the job. Using a design-led construction process, the skill moves upstream; decision-making responsibilities are transferred to the designers and are no longer the domain of on-site laborers.
Therefore, the size and skill of the on-site construction labor force needed for design-led methods is much less than with traditional building methods.
So, how is this possible?
The fundamental difference between traditional methods
and design-led construction methods is the integration of sophisticated software, which streamlines and connects every step of the design and build process.
the best CFS solutions integrate advanced technologies, with both design and engineering capability, to drive measurable ROI and real business value.
Finally, if you'd like to see if a design-led approach might be right for you, why not take us up on our "Talk To An Expert" offer?
I know you won't be disappointed.
David Chen General Manager
E-mail:sales@smarthousing.cn
Tel:+86-574-83066356
MOB:+86-18067226015